S.N. | Project Name | Location | Client | Date | Work Accomplished |
---|---|---|---|---|---|
1 | Betan Karnali Electric Project (688 MW) | Acham District | NEAEC | 11/1/2018 7/1/2020 |
Exploratory core drilling (a total of 744.00m, max depth 120.00m) |
2 | Kimathanka Arun Electric Project (450MW) | Sankhuwashaba District | NEAEC | 6/1/2018 1/1/2021 |
Exploratory core drilling vertical and inclined, geological and engineering geological mapping, construction material survey, laboratory testing and analysis. (total 1525m, max 180.00m) |
3 | Super Tamor Hydroelectric Project (155MW) | Taplejung District | Crystal Power Development Pvt. Ltd. | 4/1/2018 11/1/2019 |
Exploratory drilling, geological and engineering geolocical mapping construction material survey and laboratory test and analysis |
4 | 400 kV Double Circuit Transmission Line Project | Eastern and Central Nepal | Stantec Inc., USA | 1/1/2019 8/1/2019 |
Geological and enginnering geological mapping, drilling and testing at substation and transmission tower, geophysical investigation (ERT and SP) |
5 | Grid Solar and Energy Project | Battar, Trishuli | RISEN Energy Co. Ltd. | 9/1/2018 7/1/2019 |
Ground improvement, soil testing, laboraoty testing and anlaysis |
6 | Solu Khola Dudhkoshi HEP (86MW) | Solukhumbu | Hydro Venture Pvt. Ltd. | 5/1/2016 11/1/2016 |
Exploratory drilling, geological and engineering geolocical mappind construction material survey and laboratory test and analysis |
7 | Rasuwagadi HEP (111 MW) | Rasuwa | China International water and Electric Corp. | 5/1/2016 8/1/2016 |
Exploratory drilling (total of 168.00m linear depth, max 64.00m) |
8 | Solu Khola Dudh Koshi Hydroelectric Project (86MW) | Solukhumbu | Hydro Venture Pvt. Ltd. | 3/1/2013 9/1/2013 |
Exploratory drilling, geological and engineering geolocical mapping construction material survey and laboratory test and analysis |
9 | Super Trishuli Hydroelectric Project (80MW) | Chitwan / Gorkha | Blue Energy Pvt. Ltd | 9/1/2014 11/1/2014 |
Exploratory drilling, geological and engineering geolocical mapping, construction material survey and laboratory test and slope stability analysis |
10 | Lapchi Hydroelectric Project (160MW) | Dolakha | NASA Hydropower (P) Ltd. | 5/1/2012 8/1/2012 |
Feasibiligy study, Geological mapping |
11 | Tamakoshi I Hydroelectric Project (100MW) | Ramechhap | Satyam Urja Pvt. Ltdl | 6/1/2011 9/1/2011 |
Exploratory drilling |
12 | Likhu IV Hydroelectric Projects (120MW) | Okhaldhunga | Green Venture (P) Ltd | 3/1/2011 7/1/2011 |
Geological and geotechnical investigation drilling works at headworks, surge tank and power house site |
13 | Lower Solu Hydropower Project (82 MW) | Solukhumbu | Essel-Clean Solu Hydropower Pvt. Ltd. | 12/1/2010 5/1/2011 |
Exploratory drilling, Geological and enfgineering geological mapping, construction material survey, Laboratory testing and analysis |
14 | Likhu 1 Hydroelectric Project (77 MW) | Solukhumbu | Pan Himalayan Energy (P) Ltd. | 11/1/2009 7/1/2010 |
Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis |
15 | Likhu 2 Hydroelectric Project (55 MW) | Solukhumbu | 11/1/2009 7/1/2010 |
Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis | |
16 | Likhu A Hydroelectric Project (51 MW) | Solukhumbu | Numbur Himalay Hydropower (P) Ltd. | 11/1/2009 7/1/2010 |
Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis |
17 | Upper Karnali Hydroelectric Project (900 MW) | Dailekh - Achham | GMR | 12/1/2008 12/1/2009 |
Exploratory core drilling, in situ testing,derivation of soil/rock engineering properties |